Comprehensive Item Master & Related BOM Item Structure

NO RATINGS
Page 1 of 2 Next >
View comments: newest first | oldest first | threaded
Douglas Alexander
User Rank
Blogger
Re: Related BOM
Douglas Alexander   11/10/2011 9:43:46 PM
NO RATINGS

Mario8a, the second page brings it all together. The Design Engineer has a huge responsibility at every step of the design stage right on through Sustaining Engineering. That means after the handoff to manufacturing, the documentation should be as self explanatory as possible so there is a complete audit trail for every ECO/ECN with the DE's authorizing signature. Suppose as a DE, you were not allowed imput into the operator's manual or troubleshooting guide because they were not under Document or Revision control. Now imagine, you wrote the first guide and someone changed it without your knowledge. If there is a problem in the field with the integrity of the guide, it will be considered your problem because your name is on it. But, if you had to authorize any changes and bump the revision to match the latest BOM build, the blame game won't even get started and more importantly, the customer has the right troubleshooting guide for the correct BOM build.

Douglas Alexander
User Rank
Blogger
Re: Time required for comprehensive item master and related BOM
Douglas Alexander   11/10/2011 9:12:37 PM
NO RATINGS

ThinkNThanks has identified the crux of the material presented. I also share the sentiment that this looks cumbersome, however, if I may suggest, cumbersome implies problematic in much the same way an overstuffed suitcase may be heavy, but when you get to where you are going, you have everything you need and you don't have to make extra trips to the store, interrupting your planned get-away, and changing your schedule. In fact, I am working on a prototype build first board, first BOM, and I am adding all the things we talked about right up front. On another level, this level of documentation lends itself to configurable BOMs quite ideally. Highly optioned products using a configurable BOM front end becomes as easy as picking items off the store shelf and dropping them in your shopping cart. I suspect Dell Computers are configured, assembled, and packaged in just this manner. In short, doing all the heavy lifting up front, builds muscle into the whole company and allows significant time and effort savings when the company's volumes and schedules are becoming more critical when the bulk of the effort needs to be focused on manufacturing and not documentation. Documentation Control pays for itself in a very short time because the long-term efficiencies gained more than cover the extended investment up front.

_hm
User Rank
Supply Network Guru
Re: Time required for comprehensive item master and related BOM
_hm   11/10/2011 7:42:47 PM
NO RATINGS

Cost of making very good docuemntation and bullet proof products are very high. If customer is ready to pay for this price, company can perform it. However, customer is so short of money, it is difficult to justify very complete documentation and quality.

 

stochastic excursion
User Rank
Stock Keeper
Re: Time required for comprehensive item master and related BOM
stochastic excursion   11/10/2011 3:44:36 PM
NO RATINGS

The benefits of a comprehensive item master depend more on where the product is in its lifecycle no matter what the size of the organization.  Generally the further a product is out of R&D, the more beneficial a stable BOM is.  Peripheral items, such as documents and the contents of flash memory, benefit from an item master that can be accessed and administered by both product management and marketing.

ThinkNThanks
User Rank
Stock Keeper
Re: Time required for comprehensive item master and related BOM
ThinkNThanks   11/10/2011 11:52:21 AM
NO RATINGS

I think the focus of this post is on Cost Saving strategies. At time, the organizations try to drive for cost reduction on the products, they only aim at DE and CM levels but did not focus on Documents Control. I think the DE doesn’t have to drive the process, it is not their function anyway, but the expectation is DE has to work in detail with Document Control to implement the process. We all know “garbage in is garbage out”, that why can’t throw the Document Control out of the Cost Saving Plan or deliver the great products. I think this should be done at any small or large size of organization.

jbond
User Rank
Stock Keeper
Re: Time required for comprehensive item master and related BOM
jbond   11/10/2011 7:42:27 AM
NO RATINGS

@_HM

I agree with you that this works great with a large company. Some smaller companies would have issues with the time and money it would take to implement a system like this.

mario8a
User Rank
Stock Keeper
Related BOM
mario8a   11/9/2011 11:29:41 PM
NO RATINGS

Hello 

I might lost track of the purpose of the article, just by reading I got confuse about how comprehensive should be, to my it looks cumbersome.

Perhaps is because I'm used to XXXXX-XX and managing the Rev level within the DWG structure.

_hm
User Rank
Supply Network Guru
Time required for comprehensive item master and related BOM
_hm   11/9/2011 6:47:22 PM
NO RATINGS

This is good for large organization. However, it needs significant man power and time. If you work in design department, most of work finally ends up with design engineer. How can we find a way to implement this procedures without invoving design engineers?

 



More Blogs from Best-Practices
Machine-to-machine technology is growing so rapidly that one report says there could be 10 billion connected devices by 2016. That's a big market opportunity.
Our machines are turning us into themselves. How did we get here?
Games can teach kids a lot about life; so too can we learn about the supply chain from them.
We used to think it might be two to four years before a portable DNA sequencer might become available. Suddenly, it's here and affordable.
RFID makes it possible not only to increase the quantity and types of products streaming through the supply chain, but also to build higher-level products and services.

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Latest Poll
EBN Dialogue / LIVE CHAT
Have a tête-à-tête with leaders & luminaries
EBN Dialogue enables and encourages you to participate in live chats with notable leaders and luminaries. Not only editors and journalists, but the entire EBN community is able to comment and ask questions. Listed below are upcoming and archived chats.
Archived Dialogues
Thailand Stages a Comeback
Join EBN contributor Jennifer Baljko on Thursday August 23, 2012, at 11:00 a.m. EST for a live chat on how electronic manufacturers in Thailand have shored up their supply chain to reduce the impact of future natural disasters.
Euro-Crisis: What It Means for High-Tech Firms
Join EBN Editor in Chief Bolaji Ojo and Contributing Editor Jennifer Baljko on Thursday, July 12, at 10:00 a.m. EDT for a Live Chat on high-tech and Europe's economic difficulties.
Microsoft Surface: Potential Winners & Losers
What are the implications for the electronics industry supply chain of Microsoft Corp.'s decision to launch its own tablet PC? Join industry veteran and EE Times' systems and OEM expert Rick Merritt on Tuesday, July 3, at 12:00 pm EDT for a Live Chat on this subject.
Latest EBN Dialogue
Join EBN contributor Jennifer Baljko on Thursday August 23, 2012, at 11:00 a.m. EST for a live chat on how electronic manufacturers in Thailand have shored up their supply chain to reduce the impact of future natural disasters.
READ DIALOGUE
Webinars
Upcoming Webinars
Date: 6/18/2013 11:00 a.m. eastern
Peter Drucker famously said "Trying to predict the future is like trying to drive down a country road at night with no lights while looking out the back window." Yet in the razor's-edge world of electronics—with a lean supply chain and just-in-time demands—the need to know the future is vital. While no one really can accurately predict the future, we can take guidance from another Drucker saying which is the best way to predict the future is to create it.
Archived Webinars
Date: 4/30/2013
You've heard the saying "the No. 1 supply chain risk is your people." That hasn't always been the case. But today's complex global supply chain requires a new type of multitalented employee. It's one who understands, finance, marketing, economics, is savvy with technology, graceful with relationships and can think analytically. Where are these people? Are universities properly preparing the next generation supply chain professionals? How do train your existing workforce for these new, demanding positions? Brian Fuller, editor-in-chief of EBN, will lead a 60-minute Avnet Velocity panel discussion that will ask and answer these and other questions swirling around today's supply-chain talent challenges.
EBN Newswire
MANSFIELD, TEXAS   3/12/2013
Mouser Receives Top Award from Harwin
SANTA CLARA, CALIF.   1/29/2013
UBM & Lytica Launch Component Pricing Tool
SANTA MONICA, CA   1/15/2013
Master Distributors Offering Tamura Sensors
FORT WORTH, TX   1/15/2013
Executive Moves at Allied Electronics
MOORESTOWN, NJ   1/11/2013
Alliance Sensors Partners With Marposs
FORT WORTH, TX   1/9/2013
TTI Enhances Apple iOS Mobile App
Video Resources
Twitter Feed
EBN Online Twitter Feed
Like Us on Facebook