The Raw Power of the RFQ ProcessWay back before there was software for generating request-for-quotes (RFQs), there were blank ledger forms. These were multiple row and columnar pages in a paper binding that could be used for almost anything, from inventory records to purchasing logs. Filling in these paper sheets was very time-consuming, but it was the only option for early buyers. Now, with distributors offering online products and services, life has gotten unbelievably easier for procurement professionals. Companies like Avnet, Dig-Key, and others have turnkey, Internet-based solutions that allow for entire BOMs to be uploaded for immediate price and availability quotations. Ordering then becomes a simple follow-up operation that consists of selecting the items in the BOM that reflect the best buying options, negotiating (if required), providing a purchase order number, stipulating a shipping method, and waiting for the order to arrive. This computer-aided process provides huge savings in time and effort over the early paper ledger days. Today, best practices involve having the required internet access, a reliable parts-management system, and screening filled orders to assure accuracy and part authenticity before inventory control takes over the physical parts management. In the absence of the ability to upload entire BOMs for distributor RFQs, spreadsheets are commonly used and discretely submitted to each supplier to review and enter the relevant data into the blank cells designated for pricing, minimum buy quantity, and availability. The completed spreadsheet is then emailed back to the requestor of the RFQ. Most companies have their Item Master and BOMs on company ERP/MRP systems, which provide Excel or CSV export capability. With a few macros and tweaks here and there, the spreadsheet RFQ can be prepared in short order. I just completed an 87 item RFQ today, which, from start to finish, took only an hour. Managing the RFQ data from several suppliers that sell the same products can be as easy as amending the original spreadsheet to allow for side-by-side comparison on cost and availability. One key consideration that I must mention: Purchasing history should be referenced to make sure that the new pricing is in line with what has been paid on previous orders. Many MRP systems have preset fields that will show at least three cost options, Last PO Cost, Standard Cost, or Average Cost. Remember, the last purchase may have had expedited costs, or other unusual cost factors, so using last cost as a comparison factor could be misleading. Average cost picks up several purchases and better reflects something closer to reality, but if you want a solid comparison, use standard cost. Be sure to amend this field at least twice a year to keep up with market fluctuations. Many Purchasing modules have preset percentages for allowable cost deviations that permit a reasonable cost variance from buy to buy. Accounting will set the percentage and be able to catch excessive deviations in a “Purchase Price Variation Report.” You can set the MRP display options to show, in real time, any variance exceeding the preset value before placing the order. Always archive these spreadsheets, so you have a means of quickly retrieving budgetary cost for same-assembly builds, but at higher volumes. In order to allow this contingency, always include quote quantities in excess for which you plan to buy at the time of the RFQ. That way, you can quickly decide if the next volume price break may be worth considering for your present order. You can always use the next column pricing as a negotiating tool to see if the distributor is willing to give you the higher volume discount without increasing your buy quantity. Today, I placed an RFQ for bare PCB boards. I know I'm building 40 for sure, but I asked pricing on 50, 100, 200, 250, and 500. The reality is that I may end up buying more boards than I need right now because if the price breaks at higher quantities are really aggressive, I can afford to keep some unstuffed boards in inventory. I only have to pay for setup fees and SMT solder screens once, and the lead time effectively disappears on subsequent build requirements because I already have the bare boards in inventory. The process comes down to two major considerations: One is cash flow, and the other is how confident you are in the finality of the board design. You don't want to throw away a bunch of bare boards because another change has come from Engineering that has rendered the current board unusable. In subsequent articles, I would like to discuss the purchasing processes and tools that make the procurement professional’s job labor-efficient and cost-effective. After Design, the greatest savings to a company can be realized through front-end cost management and procedures. Procurement plays a major role. The savvier the buyers are, the more the company can add to their bottom line. |
More Blogs from Best-Practices
Our machines are turning us into themselves. How did we get here?
Games can teach kids a lot about life; so too can we learn about the supply chain from them.
We used to think it might be two to four years before a portable DNA sequencer might become available. Suddenly, it's here and affordable.
RFID makes it possible not only to increase the quantity and types of products streaming through the supply chain, but also to build higher-level products and services.
It's been almost impossible to pinpoint product damage during shipment – until now.
Webinars
Archived Webinars
Date: 4/30/2013
You've heard the saying "the No. 1 supply chain risk is your people." That hasn't always been the case. But today's complex global supply chain requires a new type of multitalented employee. It's one who understands, finance, marketing, economics, is savvy with technology, graceful with relationships and can think analytically.
Where are these people? Are universities properly preparing the next generation supply chain professionals? How do train your existing workforce for these new, demanding positions?
Brian Fuller, editor-in-chief of EBN, will lead a 60-minute Avnet Velocity panel discussion that will ask and answer these and other questions swirling around today's supply-chain talent challenges.
EBN Newswire
PHOENIX 1/16/2013
Avnet Embedded Opens Development Labs SAN FRANCISCO 1/8/2013
Vallee Appointed to Reserve Bank Board PHOENIX 12/13/2012
Avnet to Acquire Assets of USI Electronics PHOENIX 12/12/2012
Avnet EMA Adds Digi International SAN FRANCISCO 11/29/2012
UBM Tech Launches Partbuyer.com for Electronic Procurement PHOENIX 11/19/2012
Avnet Expert to Present at CSCO Summit 10/24/2012
Is Your Supply Chain Static or Dynamic? PHOENIX 10/22/2012
Avnet EM Holds SpeedWay Design Workshops PHOENIX 10/16/2012
Avnet EMA Launches Technical Seminars PHOENIX 9/26/2012
Avnet Express Appoints Exec PHOENIX 9/19/2012
Avnet and Triad Team Up in Americas PHOENIX 9/12/2012
Avnet Recognized by InformationWeek Avnet Video Resources
Like Us on Facebook
|
|||||
|
|
||||||