Counterfeiters Exploit Obsolescence

NO RATINGS
View comments: newest first | oldest first | threaded
Barbara Jorgensen
User Rank
Blogger
Re: Show me the money
Barbara Jorgensen   6/22/2012 3:28:00 PM
NO RATINGS

Hi Kaye: I might have sounded a little too glib about the fab and engineering expenses associated with obsolete products. Although fabs are shuttered during every downturn, they are still a huge investment for, as you say, limited production runs. One of the issues I remember from researching this is the two ways you can approach manufacturing an obsolete semiconductor: re-create it exactly or duplicate its form, fit and function. (Somewhere in the recesses of my computer, I have the correct terms for that.) Both ways, I believe, require some kind of engineering because of the points you bring up: equipment has changed, materials have changed, processes have changed, regulations have changed. It isn't easy at all, and I apologize if I implied it was. The companies that are dedicated to obsolescence management are some of the highest quality companies and individuals I know, and, to the credit of all, have helped people like me understand the value and challenges of the market.

KPorter
User Rank
Stock Keeper
Re: Show me the money
KPorter   6/22/2012 2:52:25 PM
NO RATINGS

@Barbara - "As for manufacturing based on existing designs, die and masks: if you already have a semiconductor fab (which are a dime a dozen, right?) it's do-able--if you don't need to re-engineer the product at all."


Well, unfortunately it isn't that simple. If it were, there wouldn't be whole conferences and groups specifically focused on mitigating obsolescence and supporting legacy technology*.. and we wouldn't have this 57% statistic around counterfeiting related to obsolescence.

Let's look at the evolution of technology alone.  In the 1960s, you had computers with relatively simple (compared to today) parts, that took up whole rooms. In fact, until the digitization of checks in the past 3-4 years, many banks would still buy up any old money and check sorting machine (working or not). They'd salvage parts and re-build machines just to keep things going.

Hopefully, they also have an engineering team who understands how to keep all that technology going, and the ins and outs of the various pieces...

Now, lets go back to that fab. The machines making all the parts evolve too.  The manufacturer needs to stay competitive right? So they're setting up their equipment for each product line, to crank out hundreds of thousands of parts each day. Technology evolves (Moore's Law), and their production needs to evolve to keep up. Otherwise they're no longer competitive in their own market.

For them to keep running off (maybe) 50 parts a year, for a handful of banks still using DEC computers, isn't realistic. You'd need to stop and change-up the production line, for 50 parts, or keep the old machines maintained and "active.".. to manufacture 50 parts per year.

This doesn't even count in things like RoHs (the most commonly used example, and one you reference). Part of the reason it was such a HUGE deal around creating obsolescence is the fact that when you change the materials, you change the functionality of the part. Maybe it can't take as high a load. Maybe it's now more susceptible to heat or conducts differently.

You don't really have the same tolerances and that impacts the components. Even though in theory you should be able to just swap in and go... the actual structure of the part has changed and some of the "features" that just seemed to be part of the chip, actually turn out to be specific properties of the metals and elements you can't use any more.

...so then you design in new components..... and have to re-certify the entire system before you can prove that it's safe and reliable to use (based on whatever industry requirements and standards).

Unfortunately, yes... this can be really expensive, time consuming, and complicated. But if you look at it like quality supply chain management: doing supply chain management right can a complicated subject even for active equipment that still has built-in support.  With legacy equipment, you're working with an entire supply chain and the engineering requirements for products from manufacturers that many not even exist any more. That's why it can be expensive, and why people come to companies like GDCA.

 

* For full disclosure, I work with GDCA, and we specialize in supporting legacy technology :)

Barbara Jorgensen
User Rank
Blogger
Show me the money
Barbara Jorgensen   6/22/2012 12:30:21 PM
NO RATINGS

@KPorter: Thanks for the detail on the costs associated with EOL/LTB. In addition to having capital to invest in an LTB, the buyer assumes the risk that someone may not need these things down the line. As for manufacturing based on existing designs, die and masks: if you already have a semiconductor fab (which are a dime a dozen, right?) it's do-able--if you don't need to re-engineer the product at all. The more I read about the processes of after-market manufacturing, the more expensive it seems. The level of resources needed is considerable.

KPorter
User Rank
Stock Keeper
Re: Obsolescence
KPorter   6/21/2012 10:35:48 PM
NO RATINGS

@Barbara- You're absolutely right, that building in to-be-discontinued inventory is a fast way to upset customers.  It is a real challenge when it comes to things like LTB (Last-Time-Buy notices) or EOL notices, and can seriously impact a company's brand and customer loyalty. 

On top of the fact that not everyone has the resources to manage overstock, for long-lasting applications...

My experience working with obsolesence/legacy management for embedded boards has been a bridging point with application OEMs, and their customers.  By the time an designer designs in a board, the components are in various stages of their own lifecycle.  At that point the OEM has to face what it will mean if the board goes EOL.. and how they're going to manage that with their customers.

Adding in, on top of that, the counterfeit issue? Right now the defense industry is the loudest voice in the counterfeit subject.. but what about a hospital who can't afford to just buy a new MRI machine? They also don't have the enginnering staff to repair a board that's gone EOL, much less validate every single component.. and as someone who needed an MRI myself in recent history.. what would happen if one of those components was counterfeit and so the board was giving inaccurate results?

Obsolesene really makes ripples across the supply chain, and impacts everyone. However, it's not going to go away.

Kaye

(If you're interested I wrote a post about it back in April, here)

KPorter
User Rank
Stock Keeper
Re: build spare inventory upfront - don't wait for EOL.
KPorter   6/21/2012 10:20:31 PM
NO RATINGS

@prabhakar:

Building spare inventory up front is more complicated than it sounds. 
  • First you have to have all the funding available, which can be hard in both defense and commercial environments -- defense because you can't always predict the funding cycles.  Commercial because you don't always have the capital to lay down 15 years of projected parts use.
  • Second, you have to actually predict the amount of stock you're going to need.  You can project that you plan to need it for 15 years, but what happens if you need it for 30 (and now it's REALLY obsolete).. or you only need it for 10, and now you have all of this overstock you need to figure out what to do with.
  • Then, you have to actually manage all this inventory, with the space costs associated, and the proper care necessary (ovens for preventing moisture from damaging the components, properly stored components to prevent electrostatic discharge, paying people to manage all this stock.. etc..), Otherwise you could have invested serious money, have authentic parts, and still not have something that works 10 years down the line.

As technology gets more complicated, you also see things like disruptive technology creating huge swaths of obsolescence, right in the middle of a project (like the current shift towards solid state, or tablets instead of desktops or laptops)... not to mention, as Barbara pointed out, legislative changes like RoHs created international obsolescence issues, left and right.. and were unexpected for many people.

 

Barbara Jorgensen
User Rank
Blogger
Obsolescence
Barbara Jorgensen   6/15/2012 12:12:35 PM
NO RATINGS

Building to-be-discontinued inventory upfront is frowned upon in the financial community, though. It's really a no-win situation for manufacturers--they are hit if they build those parts in advance and create customer-related problems when they don't.

prabhakar_deosthali
User Rank
Supply Network Guru
build spare inventory upfront - don't wait for EOL.
prabhakar_deosthali   6/14/2012 5:55:32 AM
NO RATINGS

It is a universal truth that the government projects are completed in such a slow pace that for a design on drawing board to convert itself into a working product takes ages. No doubt by the time the product is put to use , many of its components have already passed their prime in the commercial market and are about to vanish from the supply chain. The EOL panning itself takes few more years and by then the components become obsolete. This is especially true when the technological innovation is happening so rapidly that some consumer products are becoming obsolete in just a couple of years.

This situation has come to advantage for the counterfeiters who make substandard duplicate and sell at premium prices and the needy buyers are left with no choice.

 

For such organizations as military or space where the products are expected to last for decades , the spares inventory for the whole life of the product needs to be created right upfront so as to ensure genuine parts.

 

 



More Blogs from News of the Day
Only 20 percent of the manufacturing jobs lost in the United States since 2000 can be tied to outsourcing. The rest are due to productivity gains.
Biometric technology could ensure that a gun won't operate unless it is in the owner's hands.
Most security concerns focus on the theft of information and hacking. But cargo security is equally as important to the supply chain.
LG has leapfrogged rival Samsung in the large-size OLED display market by releasing a 55-inch OLED TV.
Nothing has exactly signaled a yearend run on semiconductor inventory, but the industry could expect a more balanced picture than the one IHS offers.

Datasheets.com Parts Search

185 million searchable parts
(please enter a part number or hit search to begin)
Latest Poll
EBN Dialogue / LIVE CHAT
Have a tête-à-tête with leaders & luminaries
EBN Dialogue enables and encourages you to participate in live chats with notable leaders and luminaries. Not only editors and journalists, but the entire EBN community is able to comment and ask questions. Listed below are upcoming and archived chats.
Archived Dialogues
Thailand Stages a Comeback
Join EBN contributor Jennifer Baljko on Thursday August 23, 2012, at 11:00 a.m. EST for a live chat on how electronic manufacturers in Thailand have shored up their supply chain to reduce the impact of future natural disasters.
Euro-Crisis: What It Means for High-Tech Firms
Join EBN Editor in Chief Bolaji Ojo and Contributing Editor Jennifer Baljko on Thursday, July 12, at 10:00 a.m. EDT for a Live Chat on high-tech and Europe's economic difficulties.
Microsoft Surface: Potential Winners & Losers
What are the implications for the electronics industry supply chain of Microsoft Corp.'s decision to launch its own tablet PC? Join industry veteran and EE Times' systems and OEM expert Rick Merritt on Tuesday, July 3, at 12:00 pm EDT for a Live Chat on this subject.
Latest EBN Dialogue
Join EBN contributor Jennifer Baljko on Thursday August 23, 2012, at 11:00 a.m. EST for a live chat on how electronic manufacturers in Thailand have shored up their supply chain to reduce the impact of future natural disasters.
READ DIALOGUE
Webinars
Upcoming Webinars
Date: 6/18/2013 11:00 a.m. eastern
Peter Drucker famously said "Trying to predict the future is like trying to drive down a country road at night with no lights while looking out the back window." Yet in the razor's-edge world of electronics—with a lean supply chain and just-in-time demands—the need to know the future is vital. While no one really can accurately predict the future, we can take guidance from another Drucker saying which is the best way to predict the future is to create it.
Archived Webinars
Date: 4/30/2013
You've heard the saying "the No. 1 supply chain risk is your people." That hasn't always been the case. But today's complex global supply chain requires a new type of multitalented employee. It's one who understands, finance, marketing, economics, is savvy with technology, graceful with relationships and can think analytically. Where are these people? Are universities properly preparing the next generation supply chain professionals? How do train your existing workforce for these new, demanding positions? Brian Fuller, editor-in-chief of EBN, will lead a 60-minute Avnet Velocity panel discussion that will ask and answer these and other questions swirling around today's supply-chain talent challenges.
EBN Newswire
MANSFIELD, TEXAS   3/12/2013
Mouser Receives Top Award from Harwin
SANTA CLARA, CALIF.   1/29/2013
UBM & Lytica Launch Component Pricing Tool
SANTA MONICA, CA   1/15/2013
Master Distributors Offering Tamura Sensors
FORT WORTH, TX   1/15/2013
Executive Moves at Allied Electronics
MOORESTOWN, NJ   1/11/2013
Alliance Sensors Partners With Marposs
FORT WORTH, TX   1/9/2013
TTI Enhances Apple iOS Mobile App
Video Resources
Twitter Feed
EBN Online Twitter Feed
Like Us on Facebook