Skeds Slip for Embedded Designs

NO RATINGS
View comments: newest first | oldest first | threaded
t.alex
User Rank
Supply Network Guru
Re: Funny management
t.alex   4/17/2014 10:00:23 AM
NO RATINGS

_hm, this is typical of a few companies I  have seen. Engineers seek for better places and of course the products failed.

Wale Bakare
User Rank
Supply Network Guru
Re: Abstract data?
Wale Bakare   4/14/2014 7:30:26 AM
NO RATINGS

I agree with your points - quiet often the pressure process is like bottom-up or top-down. The demand from consumers make situation tough on engineers at times. So also, on the side of management beating the time to market is always on simply because of competitors.

Wale Bakare
User Rank
Supply Network Guru
Re: Funny management
Wale Bakare   4/14/2014 7:06:14 AM
NO RATINGS

The bulk of commendation and/or condemnation still on the management. That's more reason why you got them putting pressure on the engineers to produce results as quickly as possible.

_hm
User Rank
Supply Network Guru
Funny management
_hm   4/12/2014 8:54:55 AM
NO RATINGS

If projects gets delyed, blame it on embedded engineer - first hardware and to some extent firmware.

However, if gets completed on or before time - all credit goes to management. They get bonus and promotions! What do you call it?

t.alex
User Rank
Supply Network Guru
Re: Abstract data?
t.alex   4/11/2014 7:04:48 PM
NO RATINGS

Lots of factors that can affect the project dramatically: the management, the customers, the marketing people and many others. We have to accept the  fact the it is always a moving target. 

SP
User Rank
Supply Network Guru
re:
SP   4/9/2014 1:52:24 PM
NO RATINGS

It is the engineers who gets affected if the projected has to be completed before deadline, you got to work round the clock, I know many of my friends they hardly come home when a critical bug comes in.  Work life balance has become only a bookish thing.

prabhakar_deosthali
User Rank
Supply Network Guru
re:
prabhakar_deosthali   4/9/2014 7:52:11 AM
NO RATINGS
1 saves

Many a embeeded Design projects are started in the hope of beating the competition. IF the project gets delayed either because of the budget or insufficient team members then it looses its market value and hence ahs to be scrapped.

Completing the project ahead of the competition is the most importnat thing to get the returns otherwise the team morale also gets affected.

_hm
User Rank
Supply Network Guru
Moving target
_hm   4/8/2014 6:50:11 PM
NO RATINGS

And product specifications are always moving target. It never gets finalized. And finally blame comes to embedded or other engineer. Not fair.

 

SP
User Rank
Supply Network Guru
Re: Abstract data?
SP   4/8/2014 2:12:32 PM
NO RATINGS

The companies are not hiring even when many engineers resign and as a result the whole load and deadline pressure gets distributed among the existing team and that definitely will lead to schedule slippage.

_hm
User Rank
Supply Network Guru
Abstract data?
_hm   4/5/2014 3:28:47 PM
NO RATINGS

Completed or not-completed - how do you define it? It is very subjective depending on plethora of points.

Tested or not tested, what kind QA level? It also depends on reuse of old code, reuse of old hardware or not. And most important is time - how to define start and stop time?

 

 



More Blogs from Rick Merritt
A tour of the show floor at DesignCon revealed boards, testers, and other enabling technologies for high-speed systems hitting 100G rates.
As it tries to make robots mainstream, Google has the cash, as well as a smart, passionate, and experienced enthusiast in Andy Rubin, to potentially make it happen.
Big data analytics may both mimic the human brain and replace it.
A so-called pico-camer is designed as a lens-free device significantly cheaper and smaller than today's tiniest imagers.
Latest Poll
EBN Newswire
Twitter Feed
EBN Online Twitter Feed